MD Dirt is currently performing reclamation and restoration work on Southport Pond to improve drainage and restore capacity.
Operations began with dewatering the basin to allow for excavation. Accumulated sediment is being removed, and the pond is being reshaped to restore proper depth and function.
Side slopes are being rebuilt and stabilized using ArmorMax turf reinforcement systems to provide long term erosion protection and support vegetation growth. Rip rap is being installed in designated areas to strengthen the basin and reduce future erosion.
Final grading and native seeding will complete the project and promote long-term stabilization.
Location: Wilmer, Texas
Project Type: Pond Reclamation
Scope: Dewatering, Excavation, Slope Stabilization,
Site Area: ± 44,000 CY Excavation

MD Dirt is performing full underground utility installation including water, sanitary sewer, and storm drainage systems to support site development.
The scope includes excavation and trenching for waterlines, sewer lines, and reinforced concrete storm pipe, along with installation of valves, hydrants, manholes, inlets, and outfall structures.
The project also involves import and export of material to achieve proper grades and backfill requirements. All trenching, bedding, compaction, and testing are performed in accordance with project specifications.
Location: Denison, Texas
Project Type: Commercial Site Development
Scope: Earthwork and Utilities